B-roll video of the Garrison Dam project during high water releases, including both the spillway and the regulating tunnels adjacent to the powerhouse. Also, shots of erosion extending from the regulating tunnels and attempts to armor the bank through placement of rock or rip-rap. Also available in high definition.
Date Taken: | 06.21.2011 |
Date Posted: | 09.12.2011 14:24 |
Category: | B-Roll |
Video ID: | 125531 |
VIRIN: | 110621-A-9999W-411 |
Filename: | DOD_100240165 |
Length: | 00:01:45 |
Location: | ND, US |
Downloads: | 22 |
High-Res. Downloads: | 22 |
This work, Garrison Spillway and Regulating Tunnels High Water, by Kevin Wingert, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT