From left, Lt. Col. James Griffin, 100th Civil Engineer Squadron commander, and Senior Airman Joe Hamilton, 100th CES structural journeyman, cut the tape on a new sampling lab inside of the waste-water treatment plant July 25, 2013, in building 3 on RAF Mildenhall, England. The new water treatment plant is a Prime Base Engineer Emergency Force project for the 100th CES. A Prime BEEF project is done annually to ensure the 100th CES stays deployment ready. (U.S. Air Force photo by Airman 1st Class Preston Webb/Released)
Date Taken: | 07.25.2013 |
Date Posted: | 07.26.2013 10:54 |
Photo ID: | 981898 |
VIRIN: | 130725-F-DL987-052 |
Resolution: | 2100x1500 |
Size: | 379.07 KB |
Location: | RAF MILDENHALL, SFK, GB |
Web Views: | 16 |
Downloads: | 1 |
This work, Waste-water treatment plant opens new lab [Image 2 of 2], by SSgt Preston Webb, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT