Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th
16 Foot Transonic Tunnel Rehabilitation
Transonic tunnel fan blades, with light reflections. Grady McCoy is shown standing next to the fan blades.
NASA Identifier: GPN-2000-001300
Date Taken: |
12.08.2009 |
Date Posted: |
02.08.2013 13:55 |
Photo ID: |
849848 |
Resolution: |
2983x2400 |
Size: |
628.23 KB |
Location: |
WASHINGTON, D.C., US |
Web Views: |
7 |
Downloads: |
1 |
PUBLIC DOMAIN
MORE LIKE THIS
CONTROLLED VOCABULARY KEYWORDS
TAGS
LEAVE A COMMENT