Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    USACE teams with Afghan power utility to solve outages in southern Afghanistan [Image 2 of 2]

    USACE teams with Afghan power utility to solve outages in southern Afghanistan

    Afghan and USACE engineers and electricians clean, repair and service the 110kv main disconnect switch assembly at the Sangin substation in Helmand province. This work allowed the team to safely work on the power distribution system.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.03.2012
    Date Posted: 04.05.2012 00:15
    Photo ID: 554612
    VIRIN: 120303-A-CE099-001
    Resolution: 640x480
    Size: 85.44 KB
    Location: SANGIN DISTRICT, AF

    Web Views: 80
    Downloads: 9

    PUBLIC DOMAIN