Camera Icon

Images: Navigation season begins on the upper Mississippi River [Image 4 of 4]

Photo by Patrick N. MoesSmall RSS IconSubscriptions Icon Subscribe To This Journalist

Navigation season begins on the upper Mississippi River

The Motor Vessel Deana Ann moves through the Mississippi River Pool 2, just upriver of Lock and Dam 2 in Hastings, Minn., March 17. The tow is the first of the season to reach Pool 2, which is considered to be the start of the navigation season for the U.S. Army Corps of Engineers, St. Paul District. The Corps operates all of the locks and dams along the river for navigational use.



Web Views
20
High-Res. Downloads
3

Date Taken:03.17.2012

Date Posted:03.18.2012 09:03

Photo ID:544069

VIRIN:120317-A-LI073-001

Resolution:3872x2592

Size:4.07 MB

Location:HASTINGS, MN, USGlobe

Gallery Images

Associated News

Navigation season begins on the upper Mississippi River

Options

  • Army
  • Navy
  • Air Force
  • Marines
  • Coast Guard
  • National Guard

HOLIDAY GREETINGS

SELECT A HOLIDAY:

VIDEO ON DEMAND

  • Facebook
  • Twitter
  • Youtube
  • Flickr