Images: Navigation season begins on the upper Mississippi River [Image 4 of 4]
Photo by Patrick N. Moes![]()
Subscribe To This Journalist
The Motor Vessel Deana Ann moves through the Mississippi River Pool 2, just upriver of Lock and Dam 2 in Hastings, Minn., March 17. The tow is the first of the season to reach Pool 2, which is considered to be the start of the navigation season for the U.S. Army Corps of Engineers, St. Paul District. The Corps operates all of the locks and dams along the river for navigational use.
Web Views
20
High-Res. Downloads
3
Date Taken:03.17.2012
Date Posted:03.18.2012 09:03
Photo ID:544069
VIRIN:120317-A-LI073-001
Resolution:3872x2592
Size:4.07 MB
Location:HASTINGS, MN, US![]()
Gallery Images
Associated News
Navigation season begins on the upper Mississippi River






