Camera Icon

Images: Corps completes MARB firing range project [Image 3 of 3]

Photo by Brooks Hubbard IVSmall RSS IconSubscriptions Icon

Corps completes MARB firing range project

Michael Gearan, project manager, P&S Construction, Inc., displays the initial design rendering in front of the new indoor range facility. The U. S. Army Corps of Engineers Los Angeles district completed construction of the new indoor small-arms firing range and celebrated the milestone during a ribbon cutting ceremony here, March 10.



Web Views
17
Downloads
0

Podcast Hits
0



Public Domain Mark
This work, Corps completes MARB firing range project [Image 3 of 3], by Brooks Hubbard IV, identified by DVIDS, is free of known copyright restrictions under U.S. copyright law.

Date Taken:03.10.2012

Date Posted:03.15.2012 13:27

Photo ID:542680

VIRIN:120310-A-AB280-001

Resolution:4288x2848

Size:1.26 MB

Location:MORENO VALLEY, CA, USGlobe

Gallery Images

More Like This

  • The U.S. Army Corps of Engineers Los Angeles District's Nellis Resident Office recently completed a solar panel project at the Bureau of Land Management's fire station at the Red Rock Canyon National Conservation Area near Las Vegas. The new photovoltaic system, installed in the carport canopies which were specially designed for the project, is capable of generating 40 KWAC to provide power for all the buildings on the facility.
  • The U.S. Army Corps of Engineers Los Angeles District's Nellis Resident Office recently completed a solar panel project at the Bureau of Land Management's fire station at the Red Rock Canyon National Conservation Area near Las Vegas. The new photovoltaic system is capable of generating 40 KWAC to provide power for all the buildings on the facility.
  • Viet Tran, a project engineer with the U.S. Army Corps of Engineers Los Angeles District's Nellis Resident Office, checks the battery room, June 12, at the Bureau of Land Management's fire station at the Red Rock Canyon National Conservation Area near Las Vegas. The batteries are a backup system as part of the project the District recently completed in which they installed a photovoltaic system, capable of generating 40 KWAC, to provide power for the facility.
  • Chadi Wahby, a civil engineer for the U.S. Army Corps of Engineers Los Angeles District, talks to residents of Green River, a 500-plus home residential community along the Santa Ana River, about the progress of the flood risk reduction project under construction adjacent to their development during a July 25 meeting.

Associated News

Corps completes MARB firing range project

Options

  • Army
  • Marines
  • Navy
  • Air Force
  • Coast Guard
  • National Guard

HOLIDAY GREETINGS

SELECT A HOLIDAY:

VIDEO ON DEMAND

  • Facebook
  • Twitter
  • Youtube
  • Flickr