Camera Icon

Images: Bourne Bridge work continues over Cape Cod Canal [Image 1 of 2]

Courtesy Photo

Bourne Bridge work continues over Cape Cod Canal

With the recent mild winter weather, the Corps of Engineers contractor has been able to continue the steel repair work below the deck of the Bourne Bridge over the Cape Cod Canal. The contractor is moving along with repairs on the Bourne Bridge and is installing access staging under the center span over the canal. The Corps will continue to work on the Bourne Bridge this winter to minimize disruptions to traffic and recreational activities later in the summer season. (U.S. Army photo/John MacPherson)



Web Views
19
High-Res. Downloads
0

Date Taken:01.25.2012

Date Posted:01.31.2012 15:50

Photo ID:516786

VIRIN:122501-A-BJ146-001

Location:BOURNE, MA, US

Gallery Images

Options

  • Army
  • Navy
  • Air Force
  • Marines
  • Coast Guard
  • National Guard

HOLIDAY GREETINGS

SELECT A HOLIDAY:

VIDEO ON DEMAND

  • Facebook
  • Twitter
  • Youtube
  • Flickr