Spc. Justin Landrum, a native of Wellston, Ohio, assigned to 1192nd Engineer Company operates a loader to level out gravel at an entry control point on Victory Base Complex April 12. Engineers are extending the parking lot and adding gravel and limestone.
Date Taken: | 04.12.2010 |
Date Posted: | 04.22.2010 02:18 |
Photo ID: | 271934 |
VIRIN: | 100412-A-1727T-200 |
Resolution: | 1800x1147 |
Size: | 407.27 KB |
Location: | BAGHDAD, IQ |
Web Views: | 99 |
Downloads: | 12 |
This work, Engineers improve road and parking area at ECP [Image 4 of 4], by SPC Heather Todd, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT