Each piece of excess equipment, like these night vision devices, must be inspected and inventoried and before units can turn them in for reallocation as part of the accelerated drawdown of equipment.
Date Taken: | 03.26.2010 |
Date Posted: | 04.06.2010 01:50 |
Photo ID: | 266220 |
VIRIN: | 100326-A-7431G-004 |
Resolution: | 1000x669 |
Size: | 559.7 KB |
Location: | CONTINGENCY OPERATING BASE BASRA, IQ |
Web Views: | 143 |
Downloads: | 19 |
This work, Responsible drawdown; speaking logistically [Image 4 of 4], by SPC Maurice Galloway, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT