Once all four main rotor blades are removed from the AH-64D Apache attack helicopter, the crew chiefs of Company A, 4th Battalion, 227th Aviation Regiment, 1st Air Cavalry Brigade, 1st Cavalry Division, Multi-National Division ? Baghdad, waste little time removing the lead lag links from the main rotor head to complete a 125-hour inspection on the attack helicopter.
Date Taken: | 08.22.2009 |
Date Posted: | 08.25.2009 09:40 |
Photo ID: | 198352 |
VIRIN: | 090822-A-4817Z-041 |
Resolution: | 960x1440 |
Size: | 407.25 KB |
Location: | CAMP TAJI, IQ |
Web Views: | 110 |
Downloads: | 22 |
This work, ACB maintainers keep Apaches in air [Image 6 of 6], by SGT Travis Zielinski, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT