A CH-47 Chinook helicopter drops a bridge bay during the assembly of the improvised ribbon bridge across the Arkansas River, July 23 at Fort Chaffee, Ark., during Operation River Assault. Forty-two bays were used to construct the bridge across a 300-meter gap. (U.S. Army photo by Staff Sgt. Debralee Best)
Date Taken: | 07.23.2014 |
Date Posted: | 07.25.2014 00:19 |
Photo ID: | 1463666 |
VIRIN: | 140723-A-FW423-861 |
Resolution: | 4288x2848 |
Size: | 2.06 MB |
Location: | FORT CHAFFEE, AR, US |
Web Views: | 51 |
Downloads: | 6 |
This work, Engineers compose bridge across Arkansas River [Image 13 of 13], by SFC Debralee Lutgen, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT