Bridge erection boat crews await CH-47 Chinook helicopters to drop bridge bays into the Arkansas River for the assembly of the improvised ribbon bridges across the Arkansas River at Fort Chaffee, Ark., July 23. The bridge was contructed as the culmination of Operation RiverAssault - an annual training exercise focusing on collective and mission-essential training. (U.S. Army photo by Staff Sgt. Debralee Best)
Date Taken: | 07.23.2014 |
Date Posted: | 07.25.2014 00:19 |
Photo ID: | 1463660 |
VIRIN: | 140723-A-FW423-213 |
Resolution: | 4288x2848 |
Size: | 2.41 MB |
Location: | FORT CHAFFEE, AR, US |
Web Views: | 76 |
Downloads: | 6 |
This work, Engineers compose bridge across Arkansas River [Image 13 of 13], by SFC Debralee Lutgen, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT