Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Webbers Falls rehabilitation nearly two-thirds complete [Image 1 of 2]

    Webbers Falls rehabilitation nearly two-thirds complete

    TULSA, OK, UNITED STATES

    05.22.2014

    Photo by Brannen Parrish 

    U.S. Army Corps of Engineers, Tulsa District

    A recently installed Kaplan-type slant-axis turbine at Webbers Falls. Rehabilitation on one of three turbines at the hydroelectric dam is complete and accepted, while installation of a second is about 90 percent complete. The U.S. Army Corps of Engineers anticipates an 8 percent increase in power output.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 05.22.2014
    Date Posted: 05.29.2014 12:14
    Photo ID: 1369729
    VIRIN: 140522-A-PO406-001
    Resolution: 2592x3872
    Size: 3.04 MB
    Location: TULSA, OK, US

    Web Views: 15
    Downloads: 1

    PUBLIC DOMAIN