Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Bahrain bridge move huge engineering feat [Image 3 of 4]

    Bahrain bridge move huge engineering feat

    BAHRAIN

    02.28.2014

    Courtesy Photo

    U.S. Army Corps of Engineers, Middle East District

    A tied arch bridge, known as the flyover bridge, was moved into place over the Khalifa Bin Salman Causeway connecting Naval Support Activity Bahrain to the U.S. Navy port facility (NSA II). The 122.5 meter long, 21.4 meter high, 2650 metric ton bridge was constructed on NSA II, and will be driven across the causeway on self-propelled modular trailers, and set in place on pre-constructed abutments. The greatest benefit of this process allows Bahrain traffic to be disrupted for hours as opposed to months it would have taken to build the bridge in place. The bridge move was a first of its kind in the Middle East.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 02.28.2014
    Date Posted: 03.03.2014 15:41
    Photo ID: 1178226
    VIRIN: 140228-A-CE999-011
    Resolution: 4332x2372
    Size: 4.04 MB
    Location: BH

    Web Views: 54
    Downloads: 8

    PUBLIC DOMAIN