Reconstitution of Materials Supports Fight, Saves Money
407th Air Expeditionary Group Public Affairs
Story by Airman 1st Class Scott Saldukas
Date: 10.05.2009
Posted: 10.05.2009 08:49
ALI BASE, Iraq -- The 407th Expeditionary Civil Engineer Squadron at Ali Base, Iraq, have begun to prepare for the drawdown of service members serving in Iraq by starting to reconstitute their materials and equipment here.
Soon after arriving in June the 407th ECES completed an inventory of all items from expandable shelters down to the hand-tool level. The inventory allowed them to begin reconstituting or redeploy as many items to Afghanistan while still being able to perform their mission here.
"Based on the drawdown guidance, we knew it would be imperative that we start the reconstitution efforts immediately after hitting the ground in June of this year," said Lt. Col. Derek Scott who is deployed from Shaw Air Force Base, S.C. "Every item that we could safely afford to reconstitute or redeploy to Afghanistan was coordinated with the Air Force Central Command Forward Civil Engineer."
Being able to prioritize and balance what work we have to do within the squadron and efficiently begin the reconstitution process is important for them, noted Chief Master Sgt. Dennis LaClaire.
Getting an early jump on the process will not only save money but will save time and man power by the end of the drawdown.
"Over $7 million dollars worth of items from Ali Base are being distributed to various locations based on a theater priority set by the Air Force Forward Civil Engineer," said Scott. "This effort is on-going and I anticipate by mid December 2009 we'll have 90 percent of our re-deployable assets shipped out."
Reconstituting items allows the squadron to consolidate items and space that is only deemed necessary. Having outdated facilities that won't be reconstituted have been removed from the inventory but are being targeted to move into for consolidation purposes.
"Fewer items means less personnel necessary to maintain them," said Scott who hails from Little Rock, Ark. "That frees up other assets for repackaging and when the time comes for the last Airman to get on a plane, we can definitely leave a lot easier. Because the civil engineers are operating at critically stressed tempo, we have to look at every piece of material and make sure they are absolutely necessary."
Some of the items have already been delivered and were able to support the build-up of bases in Afghanistan, said the chief who is deployed from Vandenburg Air Force Base, Calif.
"Throughout this process we are able to tell our Airmen that along with saving tax payers money our extra assets here are able to support the Air Forces mission in other places that we might be stationed at later in our career," added the Minneapolis, Minn., native.
Upon reviewing their projects and processes they identified enough solar runway and taxiway lights to be able to light an entire remote airfield in Afghanistan.
"In addition to those lights, our team has plans next month to recapture solar lights made available by an on-going runway upgrade project. These solar lights will be sent to a location based on theater priorities," said the squadron commander.
Overall our goal is to have every item that we can possibly do without repackaged and forwarded to Afghanistan before the end of this rotation to aid in the fight and make it easier on the last Airmen here at Ali, said Scott.
Control Panel
|
Get More From DVIDS
Contact a DVIDS Media Specialist to access breaking news stories and photos from the front lines.
File a Media Request >>
DVIDS For Families
Military family members: you can download video and photos of your deployed family members for free!
Learn How Here! >>
News Tags
Sorry, no tags for this item
Related Stories
Iraqi policemen from the city of Nasiriyah earned explosive ordnance disposal patches Nov. 4 after completing training with Air Force EOD technicians assigned to Task Force Troy at Forward Operating Base Cedar.
11.04.09, Story by Airman 1st Class Scott Saldukas
As the responsible drawdown of forces continues in Iraq, Airmen at Ali Base have embraced the additional role of advising and assisting the local Iraqi Army and citizens during this transition.
10.22.09, Story by 1st Lt. Korry Leverett
If it moves on wheels, runs on gasoline and uses an engine, the 407th vehicle maintenance crew on Ali Base, Iraq, is most likely responsible for it from bumper to bumper.
10.14.09, Story by Airman 1st Class Tony Ritter
The 407th Expeditionary Civil Engineer Squadron at Ali Base, Iraq, have begun to prepare for the drawdown of service members serving in Iraq by starting to reconstitute their materials and equipment here.
10.05.09, Story by Airman 1st Class Scott Saldukas
As the U.S. Air Force continues to support the responsible draw down of forces in the country of Iraq it is also working to prepare the Iraqi air force to support and maintain its own flying operations on airfields across Iraq.
09.26.09, Story by 1st Lt. Korry Leverett
Today's Top Stories
11.19.09, Story by John Kruzel
11.18.09, Story by Sgt. 1st Class Michael J. Carden
11.12.09, Story by Pfc. Elizabeth Raney
11.12.09, Story by Spc. Christopher Gaylord
11.10.09, Courtesy Story
11.09.09, Courtesy Story
11.09.09, Story by Donna Miles
11.07.09, Story by Gerry Gilmore
11.06.09, Courtesy Story
11.06.09, Story by John Kruzel
|